Engineered Grinding Media · Mill OptimizationChina · Central Asia · Global Support
APPLICATION CASE
Application Case Study at CODELCO Group Ministro Hales Concentrator
Goldpro grinding media entered the Ministro Hales Concentrator under CODELCO (Chile), the world's largest copper producer. Equipped with 140mm steel balls for SAG milling and 76.2 mm steel balls for ball milling, 10 months of continuous, stable supply earned the client's "Major Contributor Supplier for Grinding Media" certification, empowering green and smart mining operations.
Grinding stage1 × 36' × 19' (10.97 × 5.79 m) SAG mill using 140 mm grinding balls; 2 × 22' × 36' (6.71 × 10.97 m) ball mills using 76.2 mm grinding balls.
Primary objectivesSupply dual-size grinding media for SAG + ball mill grinding circuits at DMH Concentrator · Pass long-term on-site verification with reliable quality and service · Support efficient, sustainable operation of green smart mines.
Validation methodOn-site Continuous-use Validation: Entered Ministro Hales in 2024 and, after 10 months of stable supply and use, earned the client's "Major Contributor Supplier for Grinding Media" certification.
SOLUTION
We achieve optimization through these methods
Two-Size Grinding Media Supply (140 mm + 76.2 mm)+Matched to the Combined SAG and Ball Milling Circuit+Green and Smart Mining Solutions
① Supplied 350 tonnes/month of 140 mm (5.5") grinding balls for the SAG mill and 550 tonnes/month of 76.2 mm (3") grinding balls for the ball mills.
②Since Goldpro grinding balls were first used at Ministro Hales in 2024, Goldpro maintained a stable supply for 10 consecutive months, demonstrating product reliability and technical service capability through long-term on-site validation.
③ Provided wear-resistant grinding media solutions aligned with the requirements of green and smart mining operations.
IMPLEMENTATION
Entered CODELCO's Ministro Hales Concentrator in 2024, with 10 months of stable supply across both SAG and ball milling circuits.
Long-term on-site validation of reliable products and technical service led to the authoritative supplier certification.
Coordination on On-Site Equipment and Operating ConditionsConfirmed grinding media specifications and monthly demand for one SAG mill (10.97 × 5.79 m) and two ball mills (6.71 × 10.97 m) at the DMH processing plant.
Reliable Supply of Two Grinding Ball SizesSupplied approximately 350 tonnes/month of 140 mm (5.5") grinding balls for the SAG mill and 550 tonnes/month of 76.2 mm (3") grinding balls for the ball mills.
Long-Term On-Site Verification & CertificationContinuous supply for 10 months starting in 2024, earning CODELCO's "Major Contributor Supplier for Grinding Media" certification based on product quality and service capabilities.
MEASURED RESULT
Customer Recognition and Progress Toward Sustainable Mining
Strong Customer RecognitionRecognized by Codelco, Chile’s national copper company and one of the world’s largest copper producers, as a “Significant Contribution Supplier for Grinding Balls,” marking a new milestone in the partnership between the two companies.
Supporting Green and Smart MiningDesigned to meet the needs of green and smart mining, helping improve operational efficiency, reduce energy consumption and environmental impact, and support sustainable development.
Demonstration of Global PresenceShowcasing Goldpro’s global presence and technical expertise, while setting a benchmark for Sino-foreign cooperation in the mining industry.
Win-Win CooperationBoth parties uphold the philosophy of "win-win cooperation" to jointly explore new pathways for the green transformation of the mining industry.
START WITH YOUR CONDITIONS
Validate the solution with site data
Share ore, mill and current-media data for a focused technical review.